Process
From survey to monitoring
Six steps with one project manager. Every document and milestone appears in your portal.
01 · 1 gün
Site survey
An engineer inspects the roof or land: dimensions, pitch, azimuth, shading, roofing, distribution board and meter.
02 · 2–3 gün
Design & proposal
Panel layout, string design, single-line diagram and statics; itemised proposal with financing options.
03 · Dağıtım şirketine göre
Applications & permits
Grid connection application, design approval and any building permits are prepared and submitted via official channels.
04 · 1–10 gün
Installation
Mounting, panels, inverter and switchgear; safety plan and daily site reports. Serial numbers are logged.
05 · 1 gün
Testing & acceptance
Insulation, earthing, string voltage and current tests; utility acceptance and metering.
06 · 25 yıl
Monitoring & O&M
Production is tracked in the customer portal; cleaning and maintenance are scheduled.